Property360 were instructed to refurbish three existing children’s toilet facilities during the summer holiday period of 2022. The toilets were tired and dated but needed to be refurbished on a budget so we worked with the school to propose cost effective materials and installation methods that would meet the required budget thresh hold. The work schedule involved:
- Complete strip out of all existing cubicles, flooring and pipework
- Removal of all waste pipes and service valves
- Installation of new water feeds, waste pipes and thermostatic mixing valves
- Preparation of all walls before cubicles were located
- Preparation and latex of all flooring areas
- Installation of all sanitary ware
- Installation of cubicle blocks with a matching theme throughout all three wc’s
- Installation of commercial grade Altro flooring throughout with cap and cove detail
- Decoration of all areas
2022 has been a busy summer period for Property360 with multiple school holiday projects running in London and the South East, some being very complex. As usual, all projects were delivered on time and on budget with all our clients leaving excellent feedback with our team. If you have a project that has tight time frames and required a quality finish, get in touch today and we’ll be happy to discuss the options available.